Water steel plant equipped with electrical motor, preset for running up, at the same time, three pillows with 900 tons stroke capacity. Metal pillows of the same thickness are suitable to be positioned in cutting executed by by diamond wire or chain saw.
Gearcase pump introduces water at 30bar pressure in the pillows, that widing apart, move tha whole block.